• About CKP
    • Firm Profile
    • Principals
    • Clients
  • Structural Design
    • New Structural Design
    • Foundations
    • Sustainability / Green Building Design
    • Seismic Design
    • Projects
  • Restoration
    • Balcony
    • Parkade
    • Structual Restoration
    • Projects
  • Building Envelope
    • Assessment
    • Cladding
    • Fenestration
    • Projects
  • Investigation
    • Insurance/Litigation
    • Failure/Forsenic Investigations
    • Structural Assessment
    • Materials Analysis
    • Projects
  •  
Home
Careers
Contact Us
Sitemap
 
Building Envelope
Assessment

Fort Prince of Wales, Churchill, MB: South Wall Stabilization

  • Challenge: Stabilization of the south wall for this Parks Canada National Historic Site.
  • Solution: Provided direction on the deconstruction, shoring and re-construction of the south wall.
Manitoba Hydro Corporate Headquarters: Curtain Wall

  • Challenge: Newly-constructed building required curtain wall system providing superior performance in terms of heat, air and moisture protection.
  • Solution: Quantification of air leakage and wind-driven rain conditions preceded the installation of a new four-sided structural silicone curtain wall system.