Building Envelope
AssessmentFort Prince of Wales, Churchill, MB: South Wall Stabilization
- Challenge: Stabilization of the south wall for this Parks Canada National Historic Site.
- Solution: Provided direction on the deconstruction, shoring and re-construction of the south wall.
- Challenge: Newly-constructed building required curtain wall system providing superior performance in terms of heat, air and moisture protection.
- Solution: Quantification of air leakage and wind-driven rain conditions preceded the installation of a new four-sided structural silicone curtain wall system.
