Structural RestorationCanada Post Vancouver Mail Processing Plant Level 1 Loading Dock Restoration: $2M restoration of the cast-in-place concrete Level 1 loading dock while facility remains in operation.
- Complete structural restoration, including repair of cast-in-place concrete floor structure and an existing waterproofing membrane.
Winnipeg James Armstrong Richardson International Airport Baggage Make-Up Area Deck Replacement: $2M multi-phase replacement of the existing concrete topping slab on heavy-gauge metal deck.
- Structural investigation utilizes advanced non-destructive testing techniques.
- Coordinate repairs to allow uninterrupted use of the facility.
Canada Post Winnipeg Mail Processing Plant Level 1 Loading DockRestoration: $2M restoration of the cast-in-place concrete loading dock (circa 1950).
- Remove existing epoxy flooring system and concrete topping.
- Extensive repair of the concrete floor structure and installation of a new silica fume modified concrete overlay.