Structural Design
University of Manitoba Engineering Information and Technology ComplexCompleted in 2005 at a cost of $45M, extensive renovations and additions were made to the existing campus buildings to house engineering and information technology faculties. Both the additions and existing buildings are connected by an atrium structure.
