Structural Design
Air Canada Maintenance HangarsThe first of two hangars was built in 1977 at a cost of $13M. It features clear spans of 280 feet, a full access overhead crane system and a 1.5 million-gallon deluge firefighting system. A second hangar and a 26,000-square foot complex of maintenance buildings were completed in 1983 at a cost of $10M.
