• About CKP
    • Firm Profile
    • Principals
    • Clients
  • Structural Design
    • New Structural Design
    • Foundations
    • Sustainability / Green Building Design
    • Seismic Design
    • Projects
  • Restoration
    • Balcony
    • Parkade
    • Structual Restoration
    • Projects
  • Building Envelope
    • Assessment
    • Cladding
    • Fenestration
    • Projects
  • Investigation
    • Insurance/Litigation
    • Failure/Forsenic Investigations
    • Structural Assessment
    • Materials Analysis
    • Projects
  •  
Home
Careers
Contact Us
Sitemap
 
Structural Design
Air Canada Maintenance Hangars
The first of two hangars was built in 1977 at a cost of $13M. It features clear spans of 280 feet, a full access overhead crane system and a 1.5 million-gallon deluge firefighting system. A second hangar and a 26,000-square foot complex of maintenance buildings were completed in 1983 at a cost of $10M.